Belmar Apartment Complex
Challenge
The rear of the building had settled and opened a hole thru the foundation large enough to climb thru. Because of the settlement the brick on the building was cracking and the decks above were leaning. Because of the proximity to the beach the soil conditions are primarily sand.
Solution
Quality 1st Basement Systems installed 3 Helical Piers on the rear of the building.
The building was lifted back in place. During the lifting process we were able to lift the building approximately 6". Upon lifting the building the damaged foundation wall was restored and the brick on the building was restored to level. All cracks were sealed.
"We had discussed several options for repair here and the contractor actually came up with the best repair. This was the reasonable cost wise and the only one to offer a warranty. We are excited about how well this went and about the money it saved the client". -Engineer
Project Summary
Installing Contractor: Quality 1st Basement Systems. Perth Amboy, NJ
Quality 1st Certified Inspector: Bob Cherry
Quality 1st Project Manager: Kevin Francy
Products Installed: 3 Helical Piers