Eagle Point Power Plant Foundation Settlement Repaired in Westville, NJ

Eagle Point Power Plant faced numerous foundation settlement issues. The flooring in the administrative building had settled from 2” up…
Burlington Coat Factory Shopping Plaza Paramus, NJ Concrete Replacement

Quality 1st Basement Systems was awarded thebid to replace all concrete sidewalks, three (3) dockpads, two (2) dumpster pads, and…
Dover at Oceanside Ortley Beach, NJ Complete Renovations

Dover at Oceanside is a condominium complex in Ortley Beach, NJ. The complex consists of two small two-story residential buildings,…
Penny Point Park Apartment Project/Egg Harbor, NJ Ellisdale Construction is…

Ellisdale Construction was contracted by the owner to make capital improvements for the new owners of the Penny Point Park…
Runaway Beach – Sandy Repairs Complete Renovations
Runaway Beach Condo Association in Sea Bright NJ was completely devastated during Super Storm Sandy in October 2012. Runaway Beach…
Lightway Electrical Footing Installation
Lightway Electrical contacted Quality 1st Contracting because they needed to install a foundation for a new electrical building. Quality 1st…
McDonalds Renovated in Edgewater, NJ

Quality 1st Basement Systems was contacted by Max Construction to install 3.5” diameter Helical piles from 30 to 50 kips…
Lowes Home Improvement Stores Repaired in Multiple Locations in NJ

US Pavement contacted Quality 1st Contracting because they had a client in need of the specialized concrete and joint sealing…