six SmartJacks in just 3 days. After the installation of the Helical piers and SmartJacks, the residence was restored back to its proper positioning. The lawn and landscaping around the home were left in excellent condition. Overall, the homeowners were extremely pleased with the results as well as the efficiency and cleanliness of the Quality 1st Basement Systems team. They couldn’t believe that such major storm damage could be repaired so well.
Project Summary
Project Engineer: Hayman Engineering
Installing Contractor: Quality 1st Basement Systems
Quality 1st Certified Inspector: Jack Jamison
Quality 1st Project Supervisor: Victor Leon
Products Installed: 8 Foundation Supportworks Helical Piers, 6 SmartJacks