small equipment and one (1) was installed in the interior using hand held equipment. The piers were advanced down to stable soils to support the weight of the building. On the opposite side of the building two walls were cracked due to crashing waves and high winds. Quality 1st Basement Systems installed ten (10) CarbonArmorTM Straps System to reinforce a wall that was in good shape, but suffered minor damage from the storm. In just 4 days the Quality 1st team was able to support the footing of one of the undermined buildings, allowing homeowners on the upper floors to safely enter their homes and begin the rebuilding process. The walls that were reinforced allowed other contractors to begin framing, electrical and HVAC work so homeowners on the ground floor could also begin their rebuilding.
Project Summary
Project Engineer: Hayman Engineering / Innovative Engineering
Installing Contractor: Quality 1st Contracting
Quality 1st Certified Inspector: Bob Cherry / Tom Roman
Products Installed: 5 Foundation Supportworks Helical Piers, 10 CarbonArmor Straps